HOOKE, A & GARDENER, M (2008) Revegetation of Ranger and Jabiluka 2007. Report for ERA Ranger Mine -February 2008. 15pp and appendices.

HOOKE, A. (2008) Short Report: A pilot study into the feasibility of traditional burning in the non-operational areas of ERA leases.- August 2008.

ILES M & KLESSA D (2008) Characterisation of Ranger Wetland and Billabong Sediments. Volume 1.A Literature and Data Review for the Period 1981 – 2002. Report for ARRTC. –May 2008 36pp plus appendices.

ILES, M., PARRY, D., KLESSA, D. (2008) Characterisation of Ranger Wetland and Billabong Sediments. Volume 2. Project-based monitoring of on-site water bodies 2003 – 2006. Report for ARRTC (draft) - May 2008.36pp plus appendices.

FIRTH, R. (2008) Surveys for the threatened Northern Hopping-mouse, Northern Quoll & Brush-tailed Rabbit-rat on GEMCO eastern exploration leases (Groote Eylandt). Report to GEMCO.-June 2008. 19pp. plus appendices.

PUHALOVICH, A., HUDSON, M., CRAMER, D. & GELLERT, C (2008) .Mt Todd Rehabilitation Strategy. Report to Department of Primary Industry, Fisheries and Mines. –June 2008.93pp. plus appendices.

ZIMMERMANN, A., STOCKTON, D., JONES, D. FAWCETT, M.& CARTER, M. (2008) Field Investigations for the Rehabilitation for Abandoned Mine Sites and associated Infrastructure, Gunlom Land Trust, Kakadu. Report to Parks Australia. -August 2008. 100pp.

PUHALOVICH, A A, KLESSA, D A & FRICK, L R (2007)  Hydrological systems at Ranger Mine – investigative strategies for operations and closure.  In Australia’s Uranium 2007, Abstracts.  AusIMM, Darwin, May 16-17, 2007.

CORBETT, L. (2006)  The Australian dingo, pp.745-753. In: Merrick, JR, Archer M, Hickey GM & Lee MSY (eds). 'Evolution and Biogeography of Australasian Vertebrates'. Oatlands, pp.942.

GARDENER, M, ADDISON, J, FERGUSON, A, BAYLISS, P & SPEECHLY, A (2006)  Developing closure criteria for weeds on Ranger Mine.  Fifteenth Australian Weeds Conference, Adelaide, October 2006.  4pp.

HOLLINGSWORTH, I D, ODEH, I, BUI, E & MacLEOD, P (2006)  Rule Based Land Unit Mapping.  In LAGACHERIE, P McBRATNEY, A B & VOLTZ, M (eds) ‘Digital Soil Mapping: an introductory perspective’.  Ch 17  Developments in Soil Science 31 (Elsevier, Amsterdam).

LEANEY, F W & PUHALOVICH, A A (2006)  Use of environmental tracers to better understand groundwater recharge/discharge processes, Ranger Uranium Mine, NT.  In  9th Australasian Environmental Isotope Conference & 2nd Australasian Hydrogeology Research Conference (‘Integrating Research & Innovation’), 13-15th December 2006, Adelaide, South Australia. 

LOWRY, J B C, EVANS, D R & HOLLINGSWORTH, I (2006)  Assessing landscape reconstruction at the Ranger Mine using landform evolution modelling.  In Fourie, A & Tibbett, M (eds) Mine Closure 2006:  Proceedings of the First International Seminar on Mine Closure.  13-15 September, Perth, Australia.  577-586.

PUIG, P & LLOYD, J  (2006)  New approaches to fisheries management using a fuzzy rule based dynamic model. In Australian Society of Fish Biology 2006 conference and workshop on cutting-edge technologies in fish and fisheries science – Abstracts and official program, p. 101. Tasmanian Aquaculture & Fisheries Institute - University of Tasmania. Hobart (Australia).

ANDERSEN, A N, COOK, G D, CORBETT, L, DOUGLAS, M M, EAGER, R W, RUSSELL-SMITH, J, SETTERFIELD, S A, WILLIAMS, R J & WOINARSKI, J C Z (2005, in press)
Fire frequency and biodiversity conservation in Australian tropical savannas: Implications from the Kapalga fire experiment. Australian Ecology.

GARDENER, M R, SINDEL, B M, WHALLEY, R D B & EARL, J M (2005)  Can Nassella neesiana, Chilean Needle Grass, be incorporated into a grazing management system in Australia?  Tussock Terminators Forum, Albury, November 2005 (in press).

HOLLINGSWORTH, I D (2005) Impacts from the waste rock stockpiles at ERA Ranger Mine and their Rehabilitation. In TAYLOR, G F (Ed.) Geological Society of Australia, Abstracts No. 78, p 19. 4th Sprigg Symposium ‘Uranium: Exploration, Deposits, Mines and Minewaste Disposal Geology’.  Australian Minerals Foundation, Adelaide, 1st December 2005.

HOLLINGSWORTH, ID (2005)
Landscape reconstruction at Ranger Mine. NARGIS 2005 Conference: Applications in Tropical Spatial Science, Darwin, 4-8 July 2005.

KLESSA, D A & MILNES, A R (2005)  Water management as Ranger moves towards closure.  In  Proceedings Australian Journal of Mining Conference ’Water Management in Mining’, Brisbane, December 12-13, 2005.

PUHALOVICH, A A  (2005)  Measured and model predicted water movement in the unsaturated zone, Christmas Island, Indian Ocean.  In Proceedings. of IAH-NZHS-NZSSS Joint International Conference ‘Where Waters Meet’, Auckland, New Zealand, 28 November to 2 December, 2005.

PUHALOVICH, AA  (2005)  Use of intensive model calibration to redefine the conceptual model of stream-aquifer (karstic) interactions, Katherine River, Northern Territory, Australia.  In Proceedings of IAH-NZHS-NZSSS Joint International Conference ‘Where Waters Meet’, Auckland, New Zealand, 28 November to 2 December, 2005.

PUIG, P (2005)
Fuzzy logic and GIS modeling in Northern Australia – Why, what for and how? NARGIS 2005 Conference: Applications in Tropical Spatial Science, Darwin, 4-8 July 2005.

SHIRTLIFF, G, EGGLETON, R A, de CARITAT, P., KIRSTE, D & JONES, D ( 2005) “Deciphering macro-structural complexity in waste rock stockpiles at Ranger Uranium Mine”.  In Proceedings of Fifth Australian Workshop on Acid Drainage, Perth, August 2005.  (ACMER, Australia).

CORBETT, L K (2004)
Dingo Canis lupus dingo. In: Canids: Foxes, Wolves, Jackals and Dogs. Status Survey and Conservation Action Plan (eds. Sillero-Zubiri, C, Hoffmann, M & Macdonald, D W). IUCN/SSC Canid Specialist Group. 430 pp. (Gland, Switzerland & Cambridge, UK). pp. 223-230.

CORBETT, L (2004)
The New Guinea singing dog – unique, dingo or hybrid? Abstract. Australian Mammal Society Newsletter, October 2004, p 20.

HOLLINGSWORTH, I D, BUI, E N, ODEH, I O A, & McLEOD, P (2004)
Rule-based land unit mapping of the Tiwi Islands. Abstract, International Union of Soil Science Global Workshop on Digital Soil Mapping, Sept 14-17th Montpellier, France.

JONES, D R J & OVERALL, R A (2004)
Sediment quality guidelines – Issues with practical application. Abstract, Handbook p 69, Interact 2004, Gold Coast Queensland, 4-8 July 2004. (Australian Society for Ecotoxicology)

KLESSA, D A, JONES, D R J & KENNY, D (2004)
Water management and treatment strategy at ERA’s Ranger Mine. In ‘Water Management in Mining’, Australian Journal of Mining Conference, Perth, 28 & 29 June, 2004.

LLOYD, J R, KLESSA, D A, PARRY, D L, BUCK, P & BROWN, N (2004)
Stimulation of microbial sulphate reduction in a constructed wetland: microbiological and geochemical analysis. Water Research 38, 1822-1830.

MILNES, A R, HOLLINGSWORTH, I D, PUHALOVICH, A & JONES, D R (2004)
Rehabilitation of mined landscapes to national Park status: scientific and social challenges in tropical North Australia. In Abstracts Joint International Geomorphology Conference, 18-20 August 2004, Glasgow, UK. p. 69.

OVERALL, R A & JONES, D R J (2004)
Sustainable ammonium removal by a treatment wetland. Abstract, Handbook p 138, Interact 2004, Gold Coast Queensland, 4-8 July 2004. (Australian Society for Ecotoxicology).

DAVIDSON, J & JONES, D R (2003)
Process water management at ERA Ranger Mine. In Water in Mining 2003 – The Role of Water in a Sustainable Minerals Industry, 13-15 October 2003, Brisbane Australia.

HOLLINGSWORTH, I D (2003)
Developing environmental closure criteria for Ranger Mine. Paper presented to NT Minerals Council Annual Environmental Workshop, September 2003.

JONES, D R, LAURENCONT, T & UNGER, C (2003)
Towards achieving sustainable water management for an acidic open cut pit at Mt Morgan, QLD, In Farrell, T & Taylor, G (eds) Proceedings 6th International Conference Acid Rock Drainage (ICARD), Cairns, Australia, July 14-17, pp 513-519. AUSIMM Publication Series No 3/2003.

KLESSA, D A, MILNES, A R, JONES, D R & PUHALOVICH, A (2003)
The development of a new environmental monitoring framework and response strategy at Ranger. Minerals Council of Australia Sustainable Development Conference, Brisbane, Queensland, 10-14 November 2003.

OVERALL, R A & PARRY, D L (2003)
The uptake of uranium by Eleocharis dulcis (Chinese water chestnut) in the Ranger uranium mine constructed wetland filter. Environmental Pollution. July 2004.

SIMON-COINCON, R, SPAIN, A V & MILNES, A R (2003)
Landform processes in the post coal mining landscape, Bowen Basin, Australia. A geomorphological approach. International Journal of Surface Mining, Reclamation & Environment 17, 20-50

Selected titles of reports of
investigations since 2003

Information in the titles will give you an idea of the investigations we’ve successfully carried out recently for a number of clients.

ALARCON LEON, E (2007) Short Report: Drilling program and installation of piezometers around the Ranger tailings storage facility (TSF). Report to ERA Ranger Mine. –February, 2007. 17pp.

BURNE, N & GARDENER, M.(2007) Ecosystem Function Analysis of Rehabilitation Areas at Woodcutters Mine Site.-September 2007. 47pp.plus appendices.

CORBETT, L K (2007) Peer Review of ACMER Report 58 to Sunrise Dam Gold Mine. Report for AngloGold Ashanti Australia Limited. –May 2007. 45pp.

CORBETT, L. (2007) Short Report: Reptile and Crab Surveys, Christmas Island. Report to Christmas Island Phosphates.-December 2007 .2pp., plus appendices

DAVEY, P (ed.) (2007) Christmas Island Phosphates Environmental management Plan 2005-2007. Prepared on behalf of Phosphate resources Limited. –July 2007. 105pp.

FIRTH, R.(2007) Short Report. Agile Wallabies and Irrigation Water: report for ERA Ranger Mine.-December 2007.8pp.

FRICK, L (2007) Short Report: Impact of Cyclone Monica on water inventory in Ranger #3 pit. Report to ERA Limited. -March 2007. 4pp plus appendices.

GARDENER, M (2007) Short report: Assessing the impact of land use at ERA on biodiversity using Vettenfall’s Biotope Method. –November 2007. 8pp.

GARDENER, M., ADDISON, J. & HOOKE, A. (2007) The effects of fire on the survival of different aged revegetation . Report to ERA Ranger Mine. -December 2007.12pp.

GARDENER, M, ADDISON, J, WALDEN, D, BAYLISS, P & EDWARDS, A (2007) Aligning fire management on the ERA leases with surrounding Kakadu National Park. Report for ERA Ranger Mane. –May 2007. 34pp.

HOLLINGSWORTH, I D, HUMPHREY, C & GARDENER, M (2007) Revegetation at Ranger: an analysis of vegetation types and environmental trends in analogue areas. Report to ERA Ranger Mine. –January 2007. 122pp.

JONES, C (2007) Draft Environmental Management Plan – Operation of Territory Iron Bulk Export Facilities, East Arm, Port of Darwin. June 13, 2007. 76pp.

KLESSA, D A, FRICK, L R, KENNY, D, MILNES, A R, QUINNELL, P & VARRIS, P (2007) Position Paper: Water management strategy to meet mining opportunities and closure needs at Ranger Mine. ERA Limited. –July 2007. 40pp.

PILLAI, M (2007) Short Report: Water supply assessment, Dundee Beach. Draft report to SKM. -March 2007. 12pp

PILLAI, M (2007) Assessment of groundwater resources, Dept. of Defence facilities, Northern T.erritory. report for SMEC Pty Ltd/department of defence. –August 2007. 38pp plus appendices.

PUHALOVICH, A (2007) Proposed Commonwealth Radioactive Waste Management Facility NT – Groundwater Assessment, Fishers Ridge site. Report to Parsons Brinkerhoff/DEST. -April 2007 22pp plus appendices.

PUIG, P (2007) Short Report: Implications to Ranger and Jabiluka operations of migrating from Projection Datum AGD66 to GDA94. -June 2007. 7pp.

RAMSAY, R.& Gardener, M. (2007) Weed monitoring at Ranger and Jabiluka May/June 2007. Report to ERA Ranger Mine. –December 2007. 32pp., plus appendices

CORBETT, L (2006)  Dingo management at Telfer Gold Mine WA.  Report for Newcrest Mining Ltd Telfer Gold Mine.  –January 2006.  21pp plus appendices.

HOLLINGSWORTH, I D (2006)  Contaminated soil investigation Ranger Mine.  Report for ERA Ranger Mine.  –April 2006.  81pp plus appendices.

JACOBSEN, N & PUHALOVICH, A (2006)  Monitoring of the seepage control barrier in Pit #1:  Results September – December 2005.  Report to ERA Limited.  –February 2006.  26pp.

JONES, C (2006)    Bulk Export Facility (OM Manganese Project)  Draft Interim Operational Management Plan.  Darwin Port Corporation – East Arm.  29th March 2006.  43pp plus maps and appendices.

McGOVERN, E (2006)  ERA Ranger Annual Amended Plan of Rehabilitation #31.  01 January 2006.  Report prepared for DITR on behalf of ERA.  –January 2006.  70pp.

MILNES, A R & ZIMMERMANN, A (2006)  Summary Progress on ERA’s R&D Projects to February 2006.  Report to 17th ARRTC (27-28 February 2006).  48pp.

SHERMAN, B (2006)  Hydrodynamic modelling of Ranger uranium mine tailings dam – Final Report.  CSIRO Land & Water.  Report to EWL Sciences.  –February, 2006.  40pp.

SUPERVISING SCIENTIST (2006)  Energy Resources of Australia Ranger Mine final landform design: Stakeholder workshop, 2 December 2005.  EWL Sciences.  –February 2006.  82pp.  (Australian Government, Department of the Environment and Heritage, Supervising Scientist).

ADDISON, J & GARDENER, M (2005)  Vegetation monitoring in Ranger’s Land Application Areas:  April 2005.  Report to ERA Ranger Mine.  –October 2005.  14pp plus appendices.

ADDISON, J (2005)  Landscape Function Analysis at the Pilot Tailings Dam, McArthur River Mine.  Report to McArthur River Mining.  –June 2005.  7pp plus appendix.

ADDISON, J (2005)  Vegetation monitoring of the Bing Bong spoil area, McArthur River Mine.  Report to McArthur River Mining.  –June 2005.  10pp plus appendices.

ADDISON, J, SIMMONDS, C & GILLESPIE, D (2005)  Salvage phosphate recovery at Christmas Island Airport Extension.  Environmental Management and Rehabilitation Plan.  -May 2005.  Submitted to Department of the Environment and Heritage, Canberra.  44pp plus appendices.

CORBETT, L K (2005)  Nomination of the dingo as National Heritage.  Report for the Humane Society International.  –October 2005.  54pp.

EWL SCIENCES & TALLEGALLA CONSULTANTS (2005)  Phosphate Resources Limited Draft Environmental Impact Statement for the Proposed Christmas Island Phosphate Mines (9 sites).  EPBC 2001/487.  Main Report (17 Chapters); Technical Appendices Vol. 1 (Appendices A-G); Technical Appendices Vol. 2 (Appendices H-R).  -November 2005.

GARDENER, M, PUIG, P & ADDISON, J (2005)  Weed monitoring at Ranger and Jabiluka, May 2005.  Report to ERA Ranger Mine.  –December 2005.  13pp plus appendix.

GARDENER, M (2005) Revegetation plan for Djarr Djarr camp. Report to ERA Ranger Mine. –June 2005. 16pp.

GARDENER, M (2005)  Application for change of the schedule (Conditions of Authorisation 0108.01) regarding inspection of vegetation in irrigation areas (7.6.2.3).  Prepared for Ranger Minesite Technical Committee on behalf of ERA Ranger Mine.  –August 2005.  7pp.

HOLLINGSWORTH, I D, OVERALL, R & PUHALOVICH, A (2005)  Status of the Ranger irrigation areas – final report.  Report to ERA Ranger Mine. –February 2005.  59pp plus appendices.

HOLLINGSWORTH, I D (2005)  Review of soil contamination in the former Administration Area at Woodcutters Mine.  Report for Newmont Woodcutters Pty Ltd.  –January 2005.  33pp plus appendices.

JONES, C, GARDENER, M & GIBSON, C (2005)  Woodcutters aquatic monitoring 2005. Report for Newmont Woodcutters Pty Ltd.  -November 2005.  60pp.

JONES, C  (2005)  East Arm Wharf Bulk Export Facility (Manganese Ore).  Phase 2 Construction Environmental Management Plan.  Roadside Dump Facility, East Arm Wharf.  Prepared for Darwin Port Corporation.  –May 2005.  55pp.

JONES, C (2005)  East Arm Wharf Bulk Export facility (Manganese Ore).  Phase 1 Construction Environmental Management Plan.  Stockpile site preparation (capping) and construction of rail bottom dump facility, conveyor system and access roads on or adjacent to Section 5773 East Arm.  Prepared for Darwin Port Corporation.  –April 2005.  76pp.

JONES, C (2005)
Notice of Intent. Darwin Port – East Arm Bulk Export Facility. Prepared for Darwin Port Corporation. –February 2005. 49pp plus appendices.

JONES, D R, SIMMONDS, C & McGOVERN, E (2005)  ERA Ranger Mine Closure Model – First Pass June 2005.  –June 2005.  202 pp plus appendices.

JONES, D R (2005)  Analysis of February 2003 water quality and flow data – Mount Morgan & assessment of catchment loads.  Project MM207.  Report for Qld Department of Natural Resources and Mines.  –June 2005.  58pp.

JONES, D R (2005)
Risk analysis of discharge of treated water from the Mt Morgan minesite. Report to Queensland Department of Natural Resources and Mines. –April 2005. 12pp.

JONES, D, CORBETT, L & OVERALL, R (2005)
Water quality criteria for Georgetown Billabong. Discussion paper for ARRTC. –February 2005. 52pp.

JONES, D, CORBETT, L & OVERALL, R (2005)  Water quality criteria for Georgetown Billabong. Discussion paper for ARRTC.  –February 2005.  52pp.

KLESSA, D A (2005)  Jabiluka annual environment report October 2005.  Report for ERA Ranger Mine.  –October 2005.  11pp.

KLESSA, D A (2005)  Ranger annual environment report October 2005.  Report for ERA Ranger Mine.  –October 2005.  33pp.

KLESSA, D A, ADDISON, J, JONES, C, SHIRTLIFF, G & RAGUSA, S (2005)  An investigation into the die-back of Eleocharis dulcis in the RP1 wetland filter, Ranger Uranium Mine.  Report for ERA Ranger Mine.  –September 2005.  49pp.

KLESSA, D A (2005)  ERA Ranger Mine wet season report 2004-2005.  Report prepared for ERA Ranger Mine.  –September 2005.  139pp.

KLESSA, D A (2005)
Hydrological and mining influences on solute flux in creeks flowing within the Ranger lease: concentration variation and solute loads in Magela Creek. Report to ERA Limited. –February 2005. 122pp.

MILBANK, J & HOLLINGSWORTH, I D (2005)  Ranger post-mining landform:  Stage 1- Stockpiling & backfilling plan.  Report to ERA Limited.  –December 2005.  33pp.

PILLAI, M (2005)  Hydrogeological review of potential water resources – Emu Point community.   Report for ARUP.  –July 2005.  11pp.

PILLAI, M (2005)
Hydrogeological review of recharge and discharge mechanisms in the Ranger Mine site catchment. Report to ERA Limited. –April 2005. 9pp.

PUHALOVICH, A (2005)
Groundwater modeling of the Tindal Limestone aquifer. Final Report to NT Department of Infrastructure, Planning & Environment. –January 2005. 37pp plus appendices.

PUHALOVICH, A, MILNES, A R, JONES, C & JONES, D R (2005)
Application for interim deposition of tailings to RL+12 in Ranger #1 pit. Application to the Minesite Technical Committee. –May 2005. 36pp plus appendices.

BUSELLI, G & PUHALOVICH, A (2004)
Geophysical surveys with electrical methods and data interpretation with hydrogeological Models of the Ranger minesite Pit #1 region, October-December, 2003. Final Report to EWL Sciences Pty Ltd. -June 2004. 33 pp.

CORBETT, L K (2004)
Pre Cane Toad Indices of native vertebrate and invertebrate fauna abundance, 2002—04, at Mount Bundey Training Area, N T. Report to Department of Defence Environmental Services CSIG-NT/K, Winnellie NT. –June 2004. 17pp plus figures, tables & appendices.

HOLLINGSWORTH, I D (2004)
Blacktip Gas Project EIS: hydrology and water quality. Report to EcOz Environmental Services. –June 2004. 37pp.

HOLLINGSWORTH, I D (2004)
Site and soils evaluation for septic adsorption trenches, Churcher Stage 4 Subdivision. Report to Cardno Willing Pty Ltd. –September 2004. 17pp plus appendices.

HOLLINGSWORTH, I D & KLESSA, D A (2004)
An investigation of the propensity for and evidence of acid sulfate soil development in the Gulungul Creek catchment. Report to ERA Ranger Mine. –February 2004. 38pp.

HOLLINGSWORTH, I D & McGOVERN, E (2004)
Landscape reconstruction at Ranger Mine – approach and current status. Discussion Paper ARRTC Meeting, March 2004. 43pp.

HOLLINGSWORTH, I D & MEEK, I K (2004)
Ecosystem reconstruction for the Ranger Mine final landform – Phase 2: Target ecosystem closure criteria. Report to ERA Limited. –December 2003. 56pp plus appendices.

JACOBSEN, N (2004)
ERA sulfur shipment operations: Annual completion report for the Tivendale Road site. Report to ERA Ranger Mine. –May 2004. 43pp.

JACOBSEN, N (2004)
Tivendale Road sulfur storage facility. Environmental Management and Operations Plan. Prepared for ERA Limited. –May 2004. 22pp plus appendices.

JACOBSEN, N & JONES, D R (2004)
Backfillling the Jabiluka decline: geochemical risk assessment of the ore stockpile and IWMP sediment. Report to ERA Ranger Mine. –February 2004. 29pp.

JONES, D R (2004)
Water treatment for removal of molybdenum from groundwater for the Boddington Gold Mine expansion. Part 2 – wetlands. Report to BGM Management Company Pty Ltd. –January 2004. 22pp.

JONES, D R (2004)
Geochemical risk assessment of removal of weirs – Dee River Mount Morgan. Report to Connell Wagner Rockhampton. –March 2004. 31pp.

JONES, D R (2004)
Review of final void water quality issues. Report for Queensland Energy Resources Ltd. –April 2004. 17pp.

JONES, D R (2004)
Discussion Paper: Re-instatement of water supply to Jabiru East. Prepared for ERA Limited. –April 2004. 17pp.

JONES, D R & HOLLINGSWORTH, I D (2004)
Review of sediment and soil metals levels at Woodcutters Mine. Report to Newmont Woodcutters. –August 2004. 32pp.

JONES, D R & HOLLINGSWORTH, I D (2004)
Review of Yoganup West acid sulfate soil management plan. Report to Iluka Resources Ltd. –October, 2004. 8pp.

JONES, D R, KLESSA, D A & HOLLINGSWORTH, I D (2004)
Investigation Report: Jabiru East potable water contamination – environmental aspects. Prepared for ERA Limited. –May 2004. 27pp.

MILNES, A R (editor) (2004)
Investigation report into potable water contamination at Ranger Mine on March 23 & 24, 2004. Prepared for ERA Limited. –July 2004. 33pp plus figures and appendices.

OVERALL, R J, MASTERS, B, MILSOM, J & KLESSA, D A (2004)
ERA Ranger Mine wet season report – 2003-2004 wet season. Prepared on behalf of ERA Ranger Mine. –July 2004. 90pp.

PUHALOVICH, A (2004)
Assessment of possible impacts- Construction of the Trans Territory pipeline upstream of Crystal Spring. Report to EcOz Environmental Services. –November 2004. 13pp.

PUHALOVICH, A & JACOBSEN, N (2004)
Water sample collection and handling procedures Manual. Report to Giants Reef Mining Limited. –May 2004. 21pp plus appendices.

PUHALOVICH, A & JONES, D R (2004)
Assessment of long-term water quality in mined voids, Merlin Mine. Report to Merlin Diamonds Pty Ltd. –January 2004. 23pp.

REDDELL, P & MEEK, I K (2004)
Revegetation strategy for the final landform at Ranger Mine – approach and current status. Discussion Paper ARRTC Meeting, March 2004. 45pp.

SONTER, M, MARSHMAN, I & KLESSA, D A (2004)
Ranger Mine radiation monitoring rationale and methodology – approach and current status. Discussion Paper ARRTC Meeting, March 2004. 244pp.

STOCKTON, D J (2004)
Merlin Mine hydrocarbon assessment: summary report. Report to Argyle Diamonds (Merlin) Pty Ltd. –January 2004. 13pp plus appendices.

STOCKTON, D & McGOVERN, E (2004)
ERA Ranger Mine amended annual Plan of Rehabilitation #29. -February 2004 (revised April 2004) 60pp plus appendices.

WELCH, M (2004)
Aquatic ecology baseline survey for the Glyde Point Development Project. Report for Connell Wagner Pty Ltd. –October 2004. 25pp plus appendices.

WELCH, M, CORBETT, L & REDDELL, P (2004)
Flora and fauna impact assessment of clearing native vegetation on the site planned for a new power station at Lorim Point, Weipa. Report for Comalco Limited. –August 2004. 9pp.

WELCH, M, REDDELL, P & CORBETT, L (2004) Review of conservation strategies for protection of significant habitats in mining areas at Weipa. Report to Comalco Ltd. –December 2004. 18pp plus appendices.

WELCH, M, PUIG, P & ADDISON, J (2004) Environmental monitoring Angalarri Plain, Bradshaw Field Training Area FY 04/05. Report to Department of Defence. –December 2004. 25pp plus appendices.

CORBETT, L K (2003)
Audit of Fraser Island dingo management strategy. Report for Queensland Parks and Wildlife Service. –October 2003. 56pp.

CORBETT, L, RICHARDS, G & HERTOG, A (2003)
Fauna monitoring FY02/03 Angalarri Plain, Bradshaw Field Training Area. Report for Department of Defence, Corporate Services and Infrastructure Centre. –June 2003. 104pp.

EWL SCIENCES & TALLEGALLA CONSULTANTS (2003)
The proposed Christmas Island Phosphate Mines (9 sites) (EPBC 2001/487). Review Draft Environmental Impact Statement. Prepared on behalf of Phosphate Resources Limited. –October 2003. Main Report (17 chapters). 2 volumes of Appendices.

HOLLINGSWORTH, I D (2003)
Land capability study of the Tiwi Islands. Report to NT Department of Infrastructure, Planning and Environment. –September 2003. 94pp plus appendices.

HOLLINGSWORTH, I D (2003)
Jabiluka sediment and erosion control plan. Report for ERA Ranger Mine. -December 2003. 34pp.

HOLLINGSWORTH, I D, JONES, D R, KLESSA, D A, MILNES, A R & MEEK, I K (2003)
Developing environmental closure criteria for Ranger Mine. Discussion Paper for ARRTC. –September 2003. 25pp.

HOLLINGSWORTH, I D & PUIG, P (2003)
Cosmo Howley – Land Application Area survey. Report for Burnside Operations Pty Ltd. –March 2003. 14pp plus 1 map. (Included as appendix in Jones et al. 2003).

HOLLINGSWORTH, I, WELCH, M & GIBSON, C (2003)
Environmental monitoring FY02/03 Bradshaw Field Training Area: Selection of 10 fauna monitoring sites and establishment of 22 additional ground plots on the Angalarri Plain. Report for Department of Defence, Corporate Services and Infrastructure Centre. –June 2003. 40pp.

HOLLINGSWORTH, I D, ZIMMERMANN, A & CRAMB, G (2003)
Evaluation of capping design effects on infiltration and runoff from the final landform. Report to ERA Ranger Mine. –October 2003. 64pp plus appendices.

HOLLINGSWORTH, I, ZIMMERMANN, A, HARWOOD, M, CORBETT, L, MILNES, A R & BATTERHAM, R (2003)
Ecosystem reconstruction for the Ranger final landform – Phase 1 target habitats. Report for ERA Ranger Mine. –April 2003. 90pp plus appendices.

JONES, D R (2003)
Technical input to contingency planning process and review of water treatment options for water in the open cut pit at Mount Morgan (Project MM204.2). Stage 4 – Final Report. Report for Queensland Department of Natural resources and Mines. –January 2002. 35pp plus appendices.

JONES, D R (2003)
Review of proposed wetland design. Report for PT Kelian Equatorial Mining. –February 2003. 7pp.

JONES, D R (2003)
Outstanding water quality issues for Merlin closure planning. Report to Merlin Diamonds. –September 2003. 25pp plus appendix.

JONES, D R (2003)
Review of Molybdenum removal technologies for the Boddington Mine. Report for Boddington Project. –November 2003. 21pp.

JONES, D R, KLESSA, D A & OVERALL, R A (2003)
Performance of constructed wetlands at Ranger Mine. Discussion Paper for ARRTC. –September 2003. 12pp.

JONES, D R & PUHALOVICH, A (2003)
Groundwater pumpback for Woodcutters Mine: conceptual plan. Report to Newmont Australia. –December 2003. 17pp.

JONES, D R, STOCKTON, D, HOLLINGSWORTH, I H & PUIG, P (2003)
Phase 2 dewatering programme Cosmo Howley Pit. Report for Burnside Operations Pty Ltd. -March 2003. 20pp plus appendices.

KLESSA, D A (2003)
Jabiluka Annual Environmental Interpretative Report: 1st May 2002 – 30th April 2003. Draft ERA Report to Supervising Authority. –June 2003. 103pp plus maps.

KLESSA, D A & HOLLINGSWORTH, I D (2003)
Literature search and review on the use of soil conditioners to promote surface runoff from waste rock stockpiles. Report to ERA Ranger Mine. –June, 2003. 8pp.

KLESSA, D A & MILNES, A R (2003)
Proposal to prepare the Jabiluka site for long-term care and maintenance. Application on behalf ERA to Minesite Technical Committee. –June 2003. 15pp plus appendices and Radiation Management Plan attachment.

KLESSA, D A & OVERALL, R (2003)
ERA Ranger Mine wet season report: 2002-2003 wet season. Draft report to Supervising Authority. –July 2003. 81pp.

KLESSA, D A & WELCH, M (2003)
An assessment of the effects of Ranger Mine landforms on Gulungul Creek water chemistry. Report to ERA Ranger Mine. –March 2003. 26pp.

LEVY, V L L & JONES, D R (2003)
Adsorption of uranium on low cost substrates. Report to ERA Ranger Mine. –March 2003. 22pp.

McGOVERN, E, MILNES, A R & STOCKTON, D (2003)
Closure Plan for Ranger Mine. Draft Final Report to ERA Ranger Mine. –February 2003. 44pp plus appendices.

McGOVERN, E, JONES, D R, STOCKTON, D, ZIMMERMANN, A, PUHALOVICH, A, CORBETT, L & MEEK, I (2003)
Merlin diamond mine closure study – environmental issues. Report to Merlin Diamonds Pty Ltd. –May 2003. 79pp.

McGOVERN, E & SIMMONDS, C (2003)
Mount Morgan rehabilitation cost modelling. Report for Queensland Natural resources and Mines. –August 2003. 35pp plus appendices.

MEEK. I K, REDDELL, P, McGOVERN, E & STOCKTON, D (2003)
Revegetation strategy for Merlin Diamond Mine. Report to Merlin Diamonds Pty Ltd. –December 2003. 44pp plus 9 appendices.

MILNES, A R (2003)
ERA environmental R&D program 2003-2004. Discussion Paper for ARRTC. -September 2003. 41pp.

MILNES, A R (2003)
ERA Research Priorities 2004-2010. Overview Paper for Commonwealth Department of the Environment and Heritage. –December 2003. 12pp.

OVERALL, R A, RUSSELL, H, DAVIDSON, J & JONES, D R (2003)
In situ treatment of seepage and pond water. Report for ERA Limited. –December 2003. 39pp plus appendices.

PUHALOVICH, A (2003)
Construction of selected statutory and operational bores, Ranger uranium mine. Report to ERA Ranger Mine. –November 2003. 5pp plus 2 appendices.

PUHALOVICH, A (2003)
Assessment of possible water quality impacts, process water above RL0, Ranger #1 Pit. Report to ERA Ltd. -November 2003. 23pp. plus figures and appendices.

PUHALOVICH, A, MILNES, A R, STOCKTON, D & JONES, D R (2003)
Evaluation of Jabiluka care and maintenance strategies: overview. Report to ERA Ranger Mine. –April 2003. 11pp plus appendices (including Kalf 2003 report).

PUHALOVICH, A, OVERALL, R, JONES, D R & MILNES, A R (2003)
Development of closure criteria relating to surface water and groundwater, Woodcutters Mine. Report to Newmont Woodcutters Pty Ltd. –June, 2003. 46pp plus appendices.

PUIG, P (2003)
Anindilyakwa aquaculture GIS. Part 1. Prawn aquaculture suitability analysis and spatial data. Report to DBIRD – Darwin Aquaculture Centre. –February 2003. 33pp.

REDDELL, R & ZIMMERMANN, A (2003)
A technical audit of minesite revegetation activities by Christmas Island Phosphates. Report to Christmas Island Phosphates. CSIRO & EWL Sciences. –May 2003. 63pp.

STOCKTON, D & JONES, D R (2003)
ERA Ranger Mine – Strategic review of water management. Discussion paper. Report to ERA Ranger Mine. –May 2003. 34pp.

STOCKTON, D, JONES, D, ZIMMERMANN, A, LEWIS, G, FAWCETT, M, CARTER, M & CORBETT, L (2003)
Rehabilitation Plan for abandoned mine sites and associated infrastructure, Gunlom Land Trust, Kakadu. Part A. Final draft for Parks Australia North. –April 2003. 80pp plus appendices.

STOCKTON, D & McGOVERN, E (2003)
ERA Ranger Mine Amended Plan of Rehabilitation #28. Statutory Report to Department of Industry, Tourism and Resources. –February 2003. 63pp plus appendices.

WELCH, M (2003)
Sunrise Aquaculture EIS – freshwater aquatic survey. Report for EcOz Environmental Services. –May 2003. 15pp plus appendix.

WELCH, M & MEEK, I (2003)
Initial ecological assessment of Therang (Botchet Swamp), Weipa. Report to Comalco Aluminium Ltd. –November 2003. 29pp.

WELCH, M & MEEK, I K (2003)
Review of flora, fauna and habitats of conservation significance in the Andoom Region, Weipa. Report for Comalco Ltd. –December 2003. 19pp.

WELCH, M, OVERALL, R & JONES, D R (2003)
Woodcutters aquatic monitoring 2003. Report for Newmont Woodcutters Pty Ltd. –October 2003. 54pp.

WELCH, M & PUGH, P (2003)
Weed survey and mapping of Ranger and Jabiluka 2003. Report to ERA Ranger Mine. –August 2003. 7pp plus appendix (maps).

ZIMMERMANN, A (2003)
Referral- Salvage phosphate recovery at Christmas Island Airport extension. Submitted to Department of Environment and Heritage on behalf of Phosphate Resources Ltd. –September 2003. 24pp plus appendices.

ZIMMERMANN, A (2003)
Preliminary Information- Salvage phosphate recovery at Christmas Island Airport extension. Submitted to Department of Environment and Heritage on behalf of Phosphate Resources Ltd. –September 2003. 8pp plus appendices.